| Foundation |
: |
Isolated column footing with plinth beam. Pre Construction Anti-Termite Soil Treatment (As per structural engineer design) |
| Super Stucture |
: |
RCC framed structure with 9" brick walls for exterior, 4.5" partitions including plastering. |
| Flooring |
: |
Marble flooring for all the areas, for steps also. |
| Kitchen |
: |
Black granite top, Stainless Steel Sink, Glazed tiles dadoing upto 2"0" height above work top. |
| Toilet |
: |
Group I Color sanitary fitting and metro CP fitting provision for Geysar, glazed tiles dadoing up to 7" height water and drainage lines by PVC pipes. |
| Electricals |
: |
Three phase Electricity supply, Telephone and T.V. Points ample light, fan and power points. |
| Joineries |
: |
Main door frame & shutters fully 1st quality teakood. All other internal doors with country wood frames & skindoors, FRP door for toilets. |
| Painting |
: |
Asian exterior emulsion painting for the outer walls, cement paint for the inner walls with one coat of primer. Enamel paint for the joineries and melamine vernishing for the main door. |
| General |
: |
1.
Each room will have one loft and Cuddappah self. |
| |
|
2.
Safety grill gate for the main entrance. |
| |
|
3.
Building elevation as photo copy designed by leading architech, Bore well and UG sump septic tank will be provided. |
| Note: This spefication is for information only. we reserve our right to improve, modify and revise the specification |